New Source Review Permits

In addition to its facility-wide Title V permit, UConn also holds permits for some individual pieces of equipment on campus. These permits are required by the New Source Review regulations in §22a-174-3a of the Regulations of Connecticut State Agencies (RCSA) because the permitted equipment meets one of the applicability criteria. The permits contain operational limits and requirements for recordkeeping, emission testing and reporting. UConn holds the following NSR permits: 

098-0011 – Beach Building Emergency Generator 

098-0012 – Psychology Building Emergency Generator 

098-0015 – Biobehavioral Building #4 Emergency Generator 

098-0018 – Gampel Pavilion Emergency Generator 

098-0019 – Fenton River Wellfield Emergency Generator 

098-0026 – Central Utility Plant Boiler 9 

098-0054 – Sewage Treatment Plant Emergency Generator 

098-0056 – Cogeneration Facility Combustion Turbine 1 

098-0061 – Cogeneration Facility Combustion Turbine 2 

098-0062 – Cogeneration Facility Combustion Turbine 3 

098-0063 – Central Utility Plant Boiler 1 

098-0064 – Central Utility Plant Boiler 2 

098-0065 – Supplemental Utility Plant Boiler 10